KPN DC2 specifications
- Property of KPN: DC is situated above the most important telecoms node in the Netherlands
- 4000 m2 area
- Loading space available
Data floor specifications
- 200 m2 total area (enclosed access)
- A total of 81 racks can be installed
- 500 mm raising of the floor
- 1,000 kg/m2 bearing capacity
- 7 metre ceiling height
- New hardware (e.g. cooling systems, fire detection)
- Assembly and/or office space available
Data floor climate
- 20% – 80% average humidity
- Average temperature between 22 and 25 degrees
Data floor infrastructure
- 2 KW/m2 cooling capacity (4.6 KW/rack redundant = 20 ampére continuous consumption redundant)
- HVAC system (Heating Ventilation Air Conditioning)
- HVAC cooling system redundancy is N+1 (fully redundant)
- VESDA smoke detectors above, below and outside the data floor (Very Early Smoke Detection Apparatus)
- Leak detection (flood monitoring)
- Building Management System at KPN Real Estate Services
- Separate cable duct systems for 48 volt DC voltage, 230 volt AC voltage no break, 230 volt monitored voltage, smoke detection, patch cables, optical cables.
Data centre security
- Every door is secured and monitored
- Combination lock as cabinet security
- Internal CCTV surveillance (Closed Circuit Television on the floor)
- External CCTV surveillance (Closed Circuit Television on the site and in the building)
- Regular CCTV monitoring (all the camera images are viewed regularly)
- Three months of CCTV archiving
- Fencing around the building
- Alarm (ISD) in the building (burglar alarm)
- Monitoring of temperature and humidity under data floor
- Surveillance during office hours by security, staff and engineers
- Surveillance outside office hours by security
- 24/7/365 access for colocation clients
- Verification of visitors
- No access for minors
Energy supplies
- Two power feeds (A and B feed) – separate supply
- Generator/power feed/UPS system redundancy = 2N (a diesel generator provides the backup for the Nuon network. There are four diesel generators, each generator having a twin that can take over its function)
- UPS system non-break (immediate transition to emergency power, no interruption in the event of mains power failure)
- Generator non-stop (diesel generators work in tandem with the mains supply, no startup delay)
- 48-hour backup diesel in stock on site
- AC (230 V) available
- 4.6 KW per rack redundant (power feed A 20 ampére and power feed B 20 ampére)
- Currently CO2 neutral cooling by Nuon district cooling and 50% of our energy from Amalia wind farm. In 2010/2011 it is 100% renewable energy. The data centre is low-energy and has a PUE (Power Usage Effectiveness) of 1.3, which means that DC2 consumes no less than 70 per cent less energy than a traditional data centre.
Other details
- Technicians in attendance during office hours
- Fault-clearing service accessible 24/7